Forum Replies Created

  • Author
    Posts
  • in reply to: Attention Please! CSS Shade Structure Vote – Options #12577
    Linda Salamone
    General Member

    Done!

    in reply to: Volunteer(s) Wanted – Tech Support #12576
    Linda Salamone
    General Member

    No worries! Jana has graciously  volunteered to take over this function for the club.

    in reply to: Shade Structure Design Selection – Time to Vote! #12554
    Linda Salamone
    General Member

    Hey Tim, give Allied, Western, or Empire steel a call and get actual quotes for your ideas. Otherwise, the comments serve only as a delay.

    in reply to: Shade Structure Design Selection – Time to Vote! #12539
    Linda Salamone
    General Member

    Jimmy! I love it. I’ll be asking for a re-ballot. Thank you for taking the time to be thorough.

     

    just an FYI- a comment from a club member who is not able to post here. This was made in response to previous comments.

     

    ”This is supremely toxic management of the club’s building project.  I hope the general club population sees this as what it is, obsession, hypocrisy, incompetence, and a toxic inflated ego.  Functional management would be 1. Inside the specific shade structure cash budget  2.  Not instantly back shooting anyone else’s suggestion 3 building on positive input and accepting any and all outside suggestions with gratitude and alignment with cost cutting and club member participation, mentioning labor and material contributions, commitments by name, keeping a published record of who’s going to do what, when. People like to be involved and see their names in context of a group project.  ”

    in reply to: Shade Structure Design Selection – Time to Vote! #12525
    Linda Salamone
    General Member

    A yugo? You mean a $12,000 vehicle that gets you from point A to point B when $12k is what you have in the bank? Are we building a shade structure or a status symbol on property we don’t actually own?

    in reply to: Shade Structure Design Selection – Time to Vote! #12521
    Linda Salamone
    General Member

    That speaks volumes about your opinion of your fellow club members.  There is a lot of talent and commitment in them to get such a job done. If one of your proposals is not chosen, will you be watching from the sidelines?

    in reply to: Shade Structure Design Selection – Time to Vote! #12513
    Linda Salamone
    General Member

    Options 5 and 6 the $40,000 “installation and foundation” is a bit misleading. The idea is that club members will do much of the labor and the concrete is the big expense. But Jai Pal is hoping for a go on one of  his first 4 submissions.
    we have $12,000 raised so far.

    in reply to: Shade Structure Design Selection – Time to Vote! #12467
    Linda Salamone
    General Member

    Yes. I wrote a draft grant back in March and I will not submit the final grant until we have decided on the design. The FFF will MAYBE match half of what we’ve raised (contrary to a rumor that they already stated they were committed to doubling our fundraising effort) so the more we raise ourselves, the more funding from them that might be available.
    “Promises” or “unnamed potential investors” don’t count towards cash raised. Only money in the bank will be counted. So far that’s around $12,000

    in reply to: Shade Structure Design Selection – Time to Vote! #12461
    Linda Salamone
    General Member

    From another member who is unable to post on this forum:

    “The foundation for the steel structure quoted by Allied, and one that was omitted, Empire based in San Diego, IMHO was the lowest and best option with 30’ spacing on posts is 12” X 30” sauna tube concrete footing, called out by their company engineering , to California building code standard. Jai pal Khalsa is incorrect about the cost and design of the foundation. It’s nowhere near the > $20K he claims it would cost for the CSS to excavate and pour 8 -10 post base footings. A 10 yard truck is $1200 , short load mix on-site is $120/yard times around 1 yard per footing.”

    in reply to: Shade Structure Design Selection – Time to Vote! #12429
    Linda Salamone
    General Member

    I like option 5. With membership doing install with their collective expertise, this won’t break our bank. $34K plus more like $15K to erect. Simple, durable.

    in reply to: CSS Board Member Motivations #11208
    Linda Salamone
    General Member

    May I suggest we also have a site monitor (Lua was the last one we had) to boost club revenue and prevent any misunderstandings or gaps in information/expectations/landing protocols? I can even suggest one non pilot who might be willing to be of use instead of just hanging around.

    Linda Salamone
    General Member

    challenge accepted.

    Linda Salamone
    General Member

    So I’ll take that as a “no”.  And speculate  that this is a finger pointing/instructor bashing exercise and not so much a “let’s facilitate compliance after a simple, thorough and thoughtful attempt to get all the info”.
    Carry on.

    Linda Salamone
    General Member

    Do you want his phone number?

    Linda Salamone
    General Member

    So did you talk to the instructor? Or just post here in the hope that it would draw out information?